Finishing and trial-fitting the locomotive domes: video breakdown

Research date: Nov 27, 2026 · Sources and method

Channel breakdownA · Watch: Finishing the domes! - Pennsylvania A3 Switcher, Part 109B

Published Nov 7, 2026 · 142,958 views on Nov 24, 2026 · 1,508 seconds.

Blondihacks finishes the shells and fittings for the steam and sand domes and assembles them on the locomotive for a trial fit.

Build and payoff

  • 02:09B Blondihacks drills out the former fixture hole to make space for the boring bar that will hollow out the shell.
  • 08:10B The dome profile is brought to shape in small steps, with frequent checks against a template.
  • 16:06B Blondihacks starts turning the separate decorative cap for the sand dome.
  • 23:11B The steam dome slips over the valves. The sand dome then goes together over a fill plug hidden by the decorative cap.

Patterns

Episode milestone · 24:23B: Blondihacks closes on both domes fitted to the locomotive and treats that assembly as the visible milestone, not the completion of the locomotive.

What to borrow

Finish with the order in which the parts stack. Show what disappears under the decorative shell before the last piece goes on.