Skill tree

A prerequisite graph weaving hardware, robotics, and benchtop manufacturing together with the YouTube creation patterns and production playbook. Filter by space (Desk → Garage → Flex 6k sf), discipline branch, or video pattern to see what you can learn and film right now versus what a larger studio-factory unlocks.

Select any node to trace its prerequisite chain, inspect equipment and video pattern pairings, and jump straight to the builds on joel.build or PAROL6.

Space & studio ladder (tap to filter)
Building (6)Ready (8)Planned (12)
L0 · StartZero prerequisites
L1 · WeekendFast hardware wins
L2 · Multi-weekendMotion, vision & cells
L3 · Shop & metalMachining & closed-loop
L4 · Deep / flagshipHard metal & full-stack
Bench & electronics
CAD, printing & metal
Kinematics & control
Vision, sim & AI
Micro-factory & cells
Video & production
L0 · StartZero prerequisites
L1 · WeekendFast hardware wins
L2 · Multi-weekendMotion, vision & cells
L3 · Shop & metalMachining & closed-loop
L4 · Deep / flagshipHard metal & full-stack
BuildingDesk · 50–150 sq ftL2 Multi-weekend · Kinematics & control

FK/IK, homing & TCP frames

Done when

Home all 6 axes, verify forward and inverse kinematics against physical pose, and complete 20 repeatable pick-and-place cycles.

Equipment & space

PAROL6 on bolted tabletop plate, printed pick-and-place fixture

Story & production

Clean milestone stakes ('20 repeatable picks in a row') with a live pass/fail counter.

Requires

Unlocks

Space, equipment & story ladder

How shop footprint, utilities, and camera setup ladder from a current desk up to a 6,000 sq ft flex studio-factory:

Space tier Footprint Skills unlocked Utilities & constraints Production & story leverage
Desk / home studio 50–150 sq ft 16 skills Standard 120 V outlet, quiet, low-mess Tight overhead + macro bench shots and fast weekend payoffs — relatable builds anyone with one desk can follow today.
Garage / dedicated shop 400–800 sq ft 6 skills Dedicated 120 V / 240 V 20 A circuits, shop air compressor, fume/chip extraction, wet mess tolerance Chips flying, sparks, pneumatics, and multi-episode shop-upgrade arcs — real manufacturing without warehouse overhead.
Flex / studio-factory 3,000–6,000 sq ft 4 skills 240 V / 3-phase drops, hard-plumbed air, fume hoods, open test floor, permanent overhead studio lighting Zero-setup rolling cameras beside live stations, wide establishing shots of a real micro-factory floor, and the meta-arc of turning an empty shell into a studio-factory.

Level 0 — Start

Zero prerequisites.

Bench power, metering & E-stop

Status: Building · Desk / home studio (50–150 sq ft) · Bench & electronics

3D print clearances & inserts

Status: Building · Desk / home studio (50–150 sq ft) · CAD, printing & metal

MuJoCo sim & host agent loops

Status: Ready · Desk / home studio (50–150 sq ft) · Vision, sim & AI

Always-ready desk rig & packaging

Status: Building · Desk / home studio (50–150 sq ft) · Video & production

Level 1 — Weekend

Fast hardware wins.

MCUs, PWM & serial bus servos

Status: Ready · Desk / home studio (50–150 sq ft) · Bench & electronics

Reducers, tendons & backlash

Status: Building · Desk / home studio (50–150 sq ft) · CAD, printing & metal

Multi-DOF gaits & pose streaming

Status: Ready · Desk / home studio (50–150 sq ft) · Kinematics & control

Camera calibration & OpenCV

Status: Ready · Desk / home studio (50–150 sq ft) · Vision, sim & AI

Vibratory feeders & mini belts

Status: Ready · Desk / home studio (50–150 sq ft) · Micro-factory & cells

One milestone & 1/3/6-min beats

Status: Ready · Desk / home studio (50–150 sq ft) · Video & production

Level 2 — Multi-weekend

Motion, vision & cells.

Ordered sheet-metal & bolted frames

Status: Planned · Desk / home studio (50–150 sq ft) · CAD, printing & metal

FK/IK, homing & TCP frames

Status: Building · Desk / home studio (50–150 sq ft) · Kinematics & control

Teleop datasets & LeRobot policies

Status: Building · Desk / home studio (50–150 sq ft) · Vision, sim & AI

Cell-as-code, sensors & PLC I/O

Status: Ready · Desk / home studio (50–150 sq ft) · Micro-factory & cells

Series arcs, second pass & comments

Status: Ready · Desk / home studio (50–150 sq ft) · Video & production

Level 3 — Shop & metal

Machining & closed-loop.

Desktop SMT pick-and-place & PCBA

Status: Planned · Garage / dedicated shop (400–800 sq ft) · Bench & electronics

Benchtop CNC milling & CAM

Status: Planned · Garage / dedicated shop (400–800 sq ft) · CAD, printing & metal

CAN-bus brushless QDD & FOC

Status: Planned · Garage / dedicated shop (400–800 sq ft) · Kinematics & control

Sim-to-real RL locomotion

Status: Planned · Desk / home studio (50–150 sq ft) · Vision, sim & AI

Closed-loop tending & toolchangers

Status: Planned · Flex / studio-factory (3,000–6,000 sq ft) · Micro-factory & cells

Multi-cam shop rigs & editor loop

Status: Planned · Garage / dedicated shop (400–800 sq ft) · Video & production

Level 4 — Deep / flagship

Hard metal & full-stack.

4-axis wire EDM & hard metals

Status: Planned · Garage / dedicated shop (400–800 sq ft) · CAD, printing & metal

Custom FOC & dynamic locomotion

Status: Planned · Flex / studio-factory (3,000–6,000 sq ft) · Kinematics & control

Compliant contact & bimanual AI

Status: Planned · Flex / studio-factory (3,000–6,000 sq ft) · Vision, sim & AI

Automated desktop injection molding

Status: Planned · Garage / dedicated shop (400–800 sq ft) · Micro-factory & cells

Studio-factory bays & repeatable formats

Status: Planned · Flex / studio-factory (3,000–6,000 sq ft) · Video & production